Minghua Heavy Duty Gearbox for Post-Hole Diggers is good choice for auger drillers.
In order to satisfy the requirements of heavy-duty post-hole digging applications, our Heavy Duty Gearbox is built with a sturdy design.
Whether you're digging in difficult conditions, rocky terrain, or dense soils, our gearbox is your dependable ally in overcoming the most difficult obstacles.
Rated for tractors power |
up to 75 hp |
Gear ratio |
3:1 |
Modular |
5.08 |
Input shaft |
Plain shaft |
Output shaft |
Plain shaft |
Input speed |
540rpm |
Rated input power |
25HP |
Output torque |
100.3Nm |
Net weight |
27.3Kg |
Gearbox painting color |
As per client request |
Accurate and Smooth Auger Operation:
The auger can be precisely controlled during excavation tasks thanks to the gearbox's precise and smooth operation.
Swift Affixing and Removing:
Our gearbox makes it simple and quick to attach and remove augers, enabling smooth transitions between various auger sizes and types.
Sealed Architecture to Preserve the Environment:
The gearbox's sealed design protects it from the elements, extending the life of important parts and sustaining performance under a range of circumstances.
Heavy-Duty Bearings to Extend Their Life:
Our gearbox, which has heavy-duty bearings, is built to withstand the constant loads and stresses involved in auger excavation, ensuring long-term dependability.
Options for Custom Mounting:
The gearbox can be mounted in a variety of ways to suit different auger excavator configurations, giving equipment setups flexibility.
Effective Transmission of Power:
Our gearbox, which is optimized for effective power transfer, makes sure that the auger gets the most power from the excavator, which helps with effective soil excavation.
Features for Operator Safety:
To improve operator safety during auger excavation, safety features like protective guards or emergency stop mechanisms are incorporated into the design.
Low Need for Maintenance:
Our gearbox, which was designed with minimal maintenance needs in mind, reduces downtime and frees up operators to concentrate on excavation tasks without constant interruptions.